A Capacitated Lot Sizing Problem With Stochastic Setup Times and Overtime
| dc.contributor.author | Jabali, Ola | |
| dc.contributor.author | Gendreau, Michel | |
| dc.contributor.author | Jans, Raf | |
| dc.contributor.author | Taş, Duygu | |
| dc.date.accessioned | 2019-02-28T13:04:26Z | |
| dc.date.accessioned | 2019-02-28T11:08:20Z | |
| dc.date.available | 2019-02-28T13:04:26Z | |
| dc.date.available | 2019-02-28T11:08:20Z | |
| dc.date.issued | 2019 | |
| dc.description | Duygu Taş (MEF Author) | |
| dc.description.abstract | In this paper, we study a Capacitated Lot Sizing Problem with Stochastic Setup Times and Overtime (CLSPSSTO). We describe a mathematical model that considers both regular costs (including production, setup and inventory holding costs) and expected overtime costs (related to the excess usage of capacity). The CLSP-SSTO is formulated as a two-stage stochastic programming problem. A procedure is proposed to exactly compute the expected overtime for a given setup and production plan when the setup times follow a Gamma distribution. A sample average approximation procedure is applied to obtain upper bounds and a statistical lower bound. This is then used to benchmark the performance of two additional heuristics. A first heuristic is based on changing the capacity in the deterministic counterpart, while the second heuristic artificially modifies the setup time. We conduct our computational experiments on well-known problem instances and provide comprehensive analyses to evaluate the performance of each heuristic. (C) 2018 Elsevier B.V. All rights reserved. | |
| dc.identifier.citation | Taş, D., Gendreau, M., Jabali, O., & Jans, R. (January 01, 2019). A capacitated lot sizing problem with stochastic setup times and overtime. European Journal of Operational Research, 273, 1, 146-159. | |
| dc.identifier.doi | 10.1016/j.ejor.2018.07.032 | |
| dc.identifier.issn | 0377-2217 | |
| dc.identifier.scopus | 2-s2.0-85051522557 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.11779/722 | |
| dc.identifier.uri | http://dx.doi.org/10.1016/j.ejor.2018.07.032 | |
| dc.language.iso | en | |
| dc.relation.ispartof | European Journal Of Operational Research | |
| dc.rights | info:eu-repo/semantics/closedAccess | |
| dc.subject | Sample average approximation | |
| dc.subject | Stochastic setup times | |
| dc.subject | Heuristics | |
| dc.subject | Production | |
| dc.subject | Lot sizing | |
| dc.title | A Capacitated Lot Sizing Problem With Stochastic Setup Times and Overtime | |
| dc.type | Article | |
| dspace.entity.type | Publication | |
| gdc.author.id | Duygu Taş / 0000-0002-3579-4600 | |
| gdc.author.institutional | Taş, Duygu | |
| gdc.bip.impulseclass | C4 | |
| gdc.bip.influenceclass | C4 | |
| gdc.bip.popularityclass | C4 | |
| gdc.coar.access | metadata only access | |
| gdc.coar.type | text::journal::journal article | |
| gdc.description.department | Mühendislik Fakültesi, Endüstri Mühendisliği Bölümü | |
| gdc.description.endpage | 159 | |
| gdc.description.issue | 1 | |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | |
| gdc.description.scopusquality | Q1 | |
| gdc.description.startpage | 146 | |
| gdc.description.volume | 273 | |
| gdc.description.woscitationindex | Science Citation Index Expanded - Social Science Citation Index | |
| gdc.description.wosquality | Q1 | |
| gdc.identifier.openalex | W2883979235 | |
| gdc.identifier.wos | WOS:000449132800013 | |
| gdc.index.type | WoS | |
| gdc.index.type | Scopus | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 13.0 | |
| gdc.oaire.influence | 3.658349E-9 | |
| gdc.oaire.isgreen | true | |
| gdc.oaire.keywords | Heuristics; Lot sizing; Production; Sample average approximation; Stochastic setup times; Computer Science (all); Modeling and Simulation; Management Science and Operations Research; Information Systems and Management | |
| gdc.oaire.popularity | 1.23422845E-8 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0209 industrial biotechnology | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.openalex.collaboration | International | |
| gdc.openalex.fwci | 4.08707984 | |
| gdc.openalex.normalizedpercentile | 0.93 | |
| gdc.openalex.toppercent | TOP 10% | |
| gdc.opencitations.count | 16 | |
| gdc.plumx.mendeley | 51 | |
| gdc.plumx.scopuscites | 22 | |
| gdc.publishedmonth | Ocak | |
| gdc.scopus.citedcount | 22 | |
| gdc.virtual.author | Taş, Duygu | |
| gdc.wos.citedcount | 18 | |
| gdc.wos.collaboration | Uluslararası işbirliği ile yapılan - EVET | |
| gdc.wos.documenttype | Article | |
| gdc.wos.indexdate | 2019 | |
| gdc.wos.publishedmonth | Ocak | |
| gdc.yokperiod | YÖK - 2018-19 | |
| relation.isAuthorOfPublication | 04cc8740-944a-4127-8c52-bbbe92f03056 | |
| relation.isAuthorOfPublication.latestForDiscovery | 04cc8740-944a-4127-8c52-bbbe92f03056 | |
| relation.isOrgUnitOfPublication | 636850bf-e58c-4b59-bcf0-fa7418bb7977 | |
| relation.isOrgUnitOfPublication | 0d54cd31-4133-46d5-b5cc-280b2c077ac3 | |
| relation.isOrgUnitOfPublication | a6e60d5c-b0c7-474a-b49b-284dc710c078 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | 636850bf-e58c-4b59-bcf0-fa7418bb7977 |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- WOS000449132800013.pdf
- Size:
- 698.65 KB
- Format:
- Adobe Portable Document Format
- Description:
- Yayıncı Sürümü - Makale
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 0 B
- Format:
- Item-specific license agreed upon to submission
- Description:
