A Lot-Sizing Problem in Deliberated and Controlled Co-Production Systems

dc.contributor.author Kabakulak, Banu
dc.contributor.author Ağralı, Semra
dc.contributor.author Taşkın, Z. Caner
dc.contributor.author Pamuk, Bahadır
dc.date.accessioned 2022-01-06T05:11:02Z
dc.date.available 2022-01-06T05:11:02Z
dc.date.issued 2021
dc.description.abstract We consider an uncapacitated lot sizing problem in co-production systems, in which it is possible to produce multiple items simultaneously in a single production run. Each product has a deterministic demand to be satisfied on time. The decision is to choose which items to co-produce and the amount of production throughout a predetermined planning horizon. We show that the lot sizing problem with co-production is strongly NP-Hard. Then, we develop various mixed-integer linear programming (MILP) formulation of the problem and show that LP relaxations of all MILPs are equal. We develop a separation algorithm based on a set of valid inequalities, lower bounds based on a dynamic lot-sizing relaxation of our problem and a constructive heuristic that is used to obtain an initial solution for the solver, which form the basis of our proposed Branch & Cut algorithm for the problem. We test our models and algorithms on different data sets and provide the results.
dc.identifier.citation Pamuk, B., Agralı, S., & Kabakulak, B. (28 Dec 2021). A Lot-Sizing Problem in Deliberated and Controlled Co-Production Systems.IISE Transactions. pp. 1-47. https://doi.org/10.1080/24725854.2021.2022250
dc.identifier.doi 10.1080/24725854.2021.2022250
dc.identifier.issn 2472-5854
dc.identifier.issn 2472-5862
dc.identifier.scopus 2-s2.0-85124411078
dc.identifier.uri https://hdl.handle.net/20.500.11779/1728
dc.identifier.uri https://doi.org/10.1080/24725854.2021.2022250
dc.language.iso en
dc.publisher Taylor and Francis
dc.relation.ispartof IISE Transactions
dc.rights info:eu-repo/semantics/openAccess
dc.subject Lot-sizing
dc.subject Milp
dc.subject Co-production
dc.subject Branch & cut
dc.title A Lot-Sizing Problem in Deliberated and Controlled Co-Production Systems
dc.type Article
dspace.entity.type Publication
gdc.author.id Semra Ağralı / 0000-0002-5735-3275
gdc.author.id Bahadır Pamuk / 0000-0002-7877-655X
gdc.author.id Banu Kabakulak / 0000-0001-8613-3266
gdc.author.institutional Ağralı, Semra
gdc.bip.impulseclass C5
gdc.bip.influenceclass C5
gdc.bip.popularityclass C5
gdc.coar.access open access
gdc.coar.type text::journal::journal article
gdc.description.department Mühendislik Fakültesi, Endüstri Mühendisliği Bölümü
gdc.description.endpage 962
gdc.description.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
gdc.description.scopusquality Q2
gdc.description.startpage 1-47
gdc.description.volume 54
gdc.description.woscitationindex Science Citation Index Expanded
gdc.description.wosquality Q2
gdc.identifier.openalex W4281997824
gdc.identifier.wos WOS:000754103800001
gdc.index.type WoS
gdc.index.type Scopus
gdc.oaire.diamondjournal false
gdc.oaire.impulse 0.0
gdc.oaire.influence 2.5942106E-9
gdc.oaire.isgreen true
gdc.oaire.keywords lot-sizing
gdc.oaire.keywords Co-production
gdc.oaire.keywords Branch & Cut
gdc.oaire.keywords branch & cut
gdc.oaire.keywords Lot-Sizing
gdc.oaire.keywords MILP
gdc.oaire.popularity 2.19756E-9
gdc.oaire.publicfunded false
gdc.oaire.sciencefields 0209 industrial biotechnology
gdc.oaire.sciencefields 0211 other engineering and technologies
gdc.oaire.sciencefields 02 engineering and technology
gdc.openalex.collaboration National
gdc.openalex.fwci 0.0
gdc.openalex.normalizedpercentile 0.07
gdc.opencitations.count 0
gdc.plumx.mendeley 5
gdc.plumx.scopuscites 0
gdc.publishedmonth Aralık
gdc.relation.journal IISE Transactions
gdc.scopus.citedcount 0
gdc.virtual.author Ağralı, Semra
gdc.wos.citedcount 0
gdc.wos.collaboration Uluslararası işbirliği ile yapılan - HAYIR
gdc.wos.documenttype Article; Early Access
gdc.wos.indexdate 2022
gdc.wos.publishedmonth Aralık
gdc.yokperiod YÖK - 2021-22
relation.isAuthorOfPublication 19985ef7-cac2-4d80-be52-69d3716c5d30
relation.isAuthorOfPublication.latestForDiscovery 19985ef7-cac2-4d80-be52-69d3716c5d30
relation.isOrgUnitOfPublication 636850bf-e58c-4b59-bcf0-fa7418bb7977
relation.isOrgUnitOfPublication 0d54cd31-4133-46d5-b5cc-280b2c077ac3
relation.isOrgUnitOfPublication a6e60d5c-b0c7-474a-b49b-284dc710c078
relation.isOrgUnitOfPublication.latestForDiscovery 636850bf-e58c-4b59-bcf0-fa7418bb7977

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
A Lot Sizing Problem in Deliberated and Controlled Co Production Systems.pdf
Size:
1.13 MB
Format:
Adobe Portable Document Format
Description:
Full Text - Article

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.44 KB
Format:
Item-specific license agreed upon to submission
Description: