Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11779/1298
Title: Stokastik süreler içeren kapasite kısıtlı parti büyüklüğü belirleme problemi
Other Titles: Capacitated lot sizing problem with stochastic times
Authors: Taş, Duygu
Keywords: Parti Büyüklüğü Belirleme
Stokastik Üretim Zamanları
Stokastik Kurulum Zamanları
Ek Mesai Maliyetleri
Lot Sizing Problem
Stochastic Production Times
Stochastic Setup Times
Overtime Costs
Publisher: EJOSAT - DergiPark
Source: Taş, D. (2019). Stokastik süreler içeren kapasite kısıtlı parti büyüklüğü belirleme problemi. Avrupa Bilim ve Teknoloji Dergisi, (16), ss. 441-453, DOI: https://doi.org/10.31590/ejosat.559645
Abstract: Bu makalede üretim ve kurulum süreleri stokastik olan kapasite kısıtlı çok ürünlü dinamik parti büyüklüğü belirleme problemi ele alınmıştır. Bu problemde tüm sürelerin stokastik olduğu durum göz önünde bulundurularak hem verimli hem de güvenilir üretim planları elde edilmektedir. Ele alınan problemin amacı klasik üretim maliyetleri ve ek mesai maliyetlerinden oluşan toplam maliyeti en küçüklemektir. Klasik maliyetler, üretim, kurulum ve envanter tutmaktan kaynaklanmaktadır. Ek mesai maliyetleri ise makinenin zaman kapasitesini aşacak şekilde kullanılmasından dolayı ortaya çıkmaktadır. Öncelikle, belirli bir üretim ve kurulum planı için beklenen ek mesai süresini kesin olarak hesaplayan bir prosedür önerilmiştir. Problemi etkin bir şekilde çözmek için tabu algoritmasına dayanan bir çözüm yaklaşımı geliştirilmiştir. Bu yaklaşım üç aşamadan oluşmaktadır: Başlangıç, iyileştirme ve planlama. Algoritmanın ilk aşamasında olurlu planlar üreten bir başlangıç metodu önerilmiştir. Bulunan planlar makalede önerilen tabu arama metoduyla iyileştirilmektedir. Planlama aşamasında, yerel arama metodunun bulduğu çözümleri iyileştirmek için bir doğrusal programlama modeli geliştirilmiştir. Çözüm yöntemimizin performansı literatürde yayınlanmış alt sınırlar kullanılarak onaylanmıştır. Ayrıca, sonuçlar tabu arama yöntemimizin makul sürelerde çok iyi çözümler elde ederek iyi performans sergilediğini göstermektedir.
In this paper, we study a capacitated multi-item dynamic lot sizing problem with stochastic production and setup times. In this problem, we consider stochastic times to obtain production plans that are both efficient and reliable. The objective of the considered problem is to minimize the total cost including regular production costs and expected overtime costs. The regular costs result from production, setup and inventory holding. The expected overtime costs are incurred due to the excess usage of the machine capacity. First, a procedure that exactly computes the expected overtime for a given production and setup plan is developed. A solution procedure based on tabu search algorithm is proposed to effectively solve the problem. This procedure includes three main phases: initialization, improving, and scheduling. In the first phase of the algorithm, an initialization method is developed to construct feasible production plans. These plans are then improved by the proposed tabu search method. In the scheduling phase, a linear programming model is developed to further improve the solutions obtained by the local search method. The performance of our solution procedure is validated by the lower bounds reported in the literature. Moreover, results show that our tabu search method performs well by obtaining very good solutions in reasonable amount of times.
URI: https://hdl.handle.net/20.500.11779/1298
https://doi.org/10.31590/ejosat.559645
ISSN: 2148-2683
Appears in Collections:Endüstri Mühendisliği Bölümü koleksiyonu
TR-Dizin İndeksli Yayınlar Koleksiyonu / TR Dizin Indexed Publications Collection

Files in This Item:
File Description SizeFormat 
Ejosat-559645-738232.pdf.pdfYayıncı Sürümü - Makale1.1 MBAdobe PDFThumbnail
View/Open
Show full item record



CORE Recommender

Page view(s)

2
checked on Jun 26, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.