Endüstri Mühendisliği Bölümü Koleksiyonu
Permanent URI for this collectionhttps://hdl.handle.net/20.500.11779/1942
Browse
2 results
Search Results
Article Citation - WoS: 35Citation - Scopus: 36Large-Scale Influence Maximization Via Maximal Covering Location(Elsevier, 2021-02-01) Güney, Evren; Ruthmair, Mario; Sinnl, Markus; Leitner, MarkusInfluence maximization aims at identifying a limited set of key individuals in a (social) network which spreads information based on some propagation model and maximizes the number of individuals reached. We show that influence maximization based on the probabilistic independent cascade model can be modeled as a stochastic maximal covering location problem. A reformulation based on Benders decomposition is proposed and a relation between obtained Benders optimality cuts and submodular cuts for correspondingly defined subsets is established. We introduce preprocessing tests, which allow us to remove variables from the model and develop efficient algorithms for the separation of Benders cuts. Both aspects are shown to be crucial ingredients of the developed branch-and-cut algorithm since real-life social network instances may be very large. In a computational study, the considered variants of this branch-and-cut algorithm outperform the state-of-the-art approach for influence maximization by orders of magnitude.Article Citation - WoS: 6Citation - Scopus: 6A Strong Integer Programming Formulation for Hybrid Flowshop Scheduling(Taylor & Francis, 2019-09-09) Ağralı, Semra; Ünal, A. Tamer; Taşkın, Z. CanerWe consider a hybrid flowshop scheduling problem that includes parallel unrelated discrete machines or batch processing machines in different stages of a production system. The problem is motivated by a bottleneck process within the production system of a transformer producer located in the Netherlands. We develop an integer programming model that minimises the total tardiness of jobs over a finite planning horizon. Our model is applicable to a wide range of production systems organised as hybrid flowshops. We strengthen our integer program by exploiting the special properties of some constraints in our formulation. We develop a decision support system (DSS) based on our proposed optimisation model. We compare the results of our initial optimisation model with an improved formulation as well as with a heuristic that was in use at the company before the implementation of our DSS. Our results show that the improved optimisation model significantly outperforms the heuristic and the initial optimisation model in terms of both the solution time and the strength of its linear programming relaxation.
