  • Article
    Citation - WoS: 9
    Citation - Scopus: 10
    Sequential Testing in Batches
    (Springer, 2016-10-04) Ünlüyurt, Tonguc; Shahmoradi, Zahed; Özluk, Özgur; Selcuk, Barış; Daldal, Rebi
    We study a new extension of the Sequential Testing problem with a modified cost structure that allows performing of some tests in batches. As in the Sequential Testing problem, we assume a certain dependence between the test results and the conclusion. Namely, we stop testing once a positive result is obtained or all tests are negative. Our extension, motivated by health care applications, considers a fixed cost associated with executing a batch of tests, with the general notion that the more tests are performed in batches, the smaller the total contribution of fixed costs to the sequential testing process. The goal is to minimize the expected cost of testing by finding the optimal choice and sequence of the batches available. The resulting NP-hard model is a variation of the set partitioning problem. We propose various heuristic algorithms for the effective solution of the problem and then demonstrate the performances of the algorithms through extensive numerical experiments.
  • Article
    Citation - WoS: 20
    Citation - Scopus: 23
    A Capacitated Lot Sizing Problem With Stochastic Setup Times and Overtime
    (Elsevier Science bv, 2019-02-01) Jabali, Ola; Gendreau, Michel; Jans, Raf; Taş, Duygu
    In this paper, we study a Capacitated Lot Sizing Problem with Stochastic Setup Times and Overtime (CLSPSSTO). We describe a mathematical model that considers both regular costs (including production, setup and inventory holding costs) and expected overtime costs (related to the excess usage of capacity). The CLSP-SSTO is formulated as a two-stage stochastic programming problem. A procedure is proposed to exactly compute the expected overtime for a given setup and production plan when the setup times follow a Gamma distribution. A sample average approximation procedure is applied to obtain upper bounds and a statistical lower bound. This is then used to benchmark the performance of two additional heuristics. A first heuristic is based on changing the capacity in the deterministic counterpart, while the second heuristic artificially modifies the setup time. We conduct our computational experiments on well-known problem instances and provide comprehensive analyses to evaluate the performance of each heuristic. (C) 2018 Elsevier B.V. All rights reserved.